2setup instructions, Set-up instructions, Operating guidelines – Robinair 25200B Refrigerant Recovery Unit User Manual

Page 4

Advertising
background image

2

setup Instructions

seT-UP InsTrUCTIons

The unit comes with four 60-inch Enviro-Guard hoses with ball valves. Either

blue hose may be used where blue hose connections are called for, and either red

hose may be used for red hose connections.
CAUTION: To prevent personal injury, all valves on hoses must be in

the closed position before making connections.
1. Connect the hoses as follows:

Hose

Connect Standard End To:

Connect Ball Valve End To:

Blue Hose

TANK LIQUID fitting on unit

LIQUID port on tank

Red Hose

TANK VAPOR fitting on unit

VAPOR port on tank

Blue Hose

SYSTEM VAPOR fitting on unit

SYSTEM VAPOR port

Red Hose

SYSTEM LIQUID fitting on unit

SYSTEM LIQUID port

2. Plug the unit into a correct voltage electrical outlet. The fan starts running

immediately and the unit is ready for operation.

oPeraTInG GUIdelInes

• The voltage at the unit must be ±10% of the unit’s rated voltage.
• Extension cords must be a minimum of 14 AWG and kept as short as possible.
• To minimize mixing of refrigerants, the self-clearing procedure must be

performed after each recovery operation.

• The low-side gauge on the unit allows you to monitor system pressure and stop

recovery when a deep enough vacuum has been reached. The high-side gauge

allows you to monitor the refillable tank pressure.

• When changing from liquid to vapor, the unit may switch back and forth several

times before staying on vapor. You may notice the liquid light switching and

hear the solenoids opening and closing. This is normal and does not affect the

unit or its operation.

Advertising