Teledyne LeCroy QPHY-USB User Manual

Page 34

Advertising
background image

34

QPHY-USB Operator’s Manual Rev F

Device or Hub High-Speed Suspend Resume Reset Timing

The Suspend Resume Reset test measures the timing of the Suspend Resume and Reset actions as well as the
operating voltage of the device. The voltage upon resuming high-speed operation should be between 360 mV and
440 mV. The voltage measurement is intended to verify entering High-Speed mode. The test conditions are not
optimal for measuring the resume voltage, and therefore it is possible for a compliant device to have a peak-to-
peak voltage slightly outside this range.

1. Select Device or Hub in the Mode control and HS Suspend Resume Reset in the Test control of the

USB Test Wizard.

2. Follow the instructions in the USB Test Wizard to acquire traces for suspend, resume, reset, and reset

from suspend functions. The traces should look like the following:

Figure 32. Time from Last Start of Frame to Device Suspend

Advertising