Operating instructions, Preparing for use (steps 1 - 8) – MoJack John Deere XD Lift User Manual

Page 12

Advertising
background image

12

Operating Instructions

Preparing for use (Steps 1 - 8)

STEP 1

Unfolding the Mower Lift
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower by pulling up on the Grip Handle. Once the
Tower is in the vertical position, lift up on the Grip Handle and
drop the Tower into the Base.
• Lock the Tower into place by rotating Tower Locking Pin until
the pull ring retracts into the locking slot.

Tower

Locking Pin

(locked position)

Tower Locking Pin

(unlocked position)

Tower Locking Pin

(locked position)

STEP 2

Hair Pin

Lift Arm

Carrier

Clevis Pin

Installing Lift Arm
• Insert the Lift Arm into the Carrier and insert
the Clevis Pin through the hole in Carrier and
lock by fastening the Hair Pin to the Clevis Pin.

Advertising