Operating instructions – MoJack John Deere XD Lift User Manual

Page 20

Advertising
background image

20

STEP 21

Rotate Crank Handle to Storage position
• Push in side of handle and rotate from operating position to

the storage position. Allow to seat into the locked position.

THE MOWER LIFT IS NOW READY FOR STORAGE OR TRANSPORT.

Operating Instructions

STEP 22

Folding the jack
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower out of the Base by pulling up on the
Lift Handle and then lower the Tower.
• Secure the Tower by rotating Tower Locking Pin until
the ring drops into locking slot.

Tower Locking Pin

(locked position)

Tower Locking Pin

(unlocked position)

Advertising