Push to open installation – Apollo SWING GATE OPERATOR 1600 User Manual

Page 12

Advertising
background image

12

PUSH TO OPEN INSTALLATION

Both measurements are
taken from the center of
the hinge.

11”

6”

Direction of opening

Gate (closed)

Hinge post

Top View

Vertical position of
pivot arm (s)

Pivot arm must
be level

1/2”

Hinge post

Center Line of attachment
point for gate bracket

Front View

PIVOT ARM (s) INSTALLATION

STEP 1

Location of
pivot point

Rewiring actuator (s)
for push to open

Must be re-wired for proper operation

Strip back 6” of black sleeve from connector end of the actuator
cable. Cut and reconnect the white/orange and the red/black
motor wires as shown:

8 Pin Connector (s)

Red

Black

Red

Black

Green

White

Orange

Red
Black
Green
White
Orange

Battery +
Battery -

Continue with STEP 2, page 6

Advertising
This manual is related to the following products: