Operator installation – Apollo SWING GATE OPERATOR 1600 User Manual

Page 7

Advertising
background image

7

OPERATOR INSTALLATION

Location of Pivot Point.

1/2”

Center Line of attachment
point for gate bracket

Hinge post

Vertical position
of pivot arm

Measurements are taken from
the center of the hinge.

STEP 1

PIVOT ARM INSTALLATION (standard pull to open)

Front View

Pivot ArmMust be level

Notes:
PULL TO OPEN
pulls gate open (actuator is extended when gate is in the closed position).
PUSH TO OPEN pushes the gate open (actuator is retracted when gate is in the closed
position
).
For PUSH TO OPEN installations see page 11.

If a 400 Upgrade Kit is to be used, refer to the 400 instructions for pivot point location.

The following instructions provide up to 105

o

of swing.

Gate (closed)

13”

6”

Direction of
opening

13”

6”

Left Hand Swing

Right Hand Swing

Top View

Advertising
This manual is related to the following products: