General Requirements

Have electrical work comply with all applicable local codes and ordinances.

Verify existing site conditions and coordinate with the owner's representative and appropriate
utilities as required.

Obtain copies of all related plans, specifications, shop drawings and addenda to schedule and
coordinate related work.

Thoroughly review the project to ensure that all work meets or exceeds the above requirements.
Bring alleged discrepancies to the attention of the CCTV Project Coordinator.

Save Packaging Material

Should the camera dome need to be sent to a repair center, use the packaging that the dome was
shipped in.