Read me first – Maple Systems MAP460D User Manual

Page 3

Advertising
background image

INSTALLATION MANUAL

3

1010-0093, REV 03

Read Me First!

Your new Maple Systems OIT comes from the factory without any

communications protocol or operational software installed; therefore

The OIT will NOT operate until it has been configured using

MAPware-100 or STEPware-100.

When power is first applied, the OIT’s display will indicate that it

needs to be configured.

Use the MAPware-100 or STEPware-100 software to create a file

(or “project”) that can be downloaded to the OIT.

When the project is transferred, both communications protocol

and operational software are automatically loaded and the unit is

ready for operation.

To ensure that the OIT meets CE compliance, it is necessary to

follow all installation procedures described in this manual.

Advertising