Contract or, Detailed instructions for the contractor – Thermolec Split|Steam User Manual

Page 15

Advertising
background image

CONTRACT

OR

Page 13

Detailed Instructions for the Contractor

11.

Unpacking the Unit

11.1 Contents
Please inspect the carton’s contents and report any missing parts or damage immediately.

1 Humidifi er
1 fan housing
1 plastic faceplate
1 Main Drain tube (32” long – already installed and coiled inside the unit)
1 Steam hose (2 feet long x 1 inch I.D.)
1 Instruction and maintenance manual

1 Plastic bag containing installation material and hardware as follows:

2 Adjustable hose clips for the steam hose

1 Water hammer absorber (Red rubber hose with two brass fi ttings)

1 Small bag - KIT #10S

1 Water supply tube (1/4” dia. x 7’ long)

1

Overfl ow Drain tube for the pan (7/16” dia. x 24” long)

NOTE : The electronic humidistat and the outdoor reset sensor are optional. They may be purchased
separately.

11.2

Water Tank Detailed View. Please see Fig.11a.























Fig. 11a

Advertising