Procedure – Nexo LS18 User Manual

Page 41

Advertising
background image

GEO

S12

HARDWARE SETUP PROCEDURE

Page 41/103

8.3.6 LS18 and GEO S12 vertical array cable mounted on a ceiling

Required items

As in 2 sections above, plus

2 x VNI-LBRK (allows cable suspension for bumper, holes for cable suspension are
10mm diameter);

4 slings and shackles (not provided)

IMPORTANT

Ensure that the ceiling is strong enough to hold LS18 & GEO S12 cluster weight and
that the cables suspension system required fixing the bumper under the ceiling is
properly dimensioned.

Procedure

Connect the bumper and the two “L” brackets using the screws, washers and bolts
provided in the VNI-LBRK kit;

Proceed as in preceding sections;

4 slings and 4 shackle (not provided) are required to secure the cluster under the ceiling;

Advertising
This manual is related to the following products: