4 single geo s12 flown horizontally, Required items, Procedure – Nexo LS18 User Manual

Page 49

Advertising
background image

GEO

S12

HARDWARE SETUP PROCEDURE

Page 49/103

8.4.4 Single GEO S12 flown horizontally

Required items

1 x “U” Bracket for single horizontal GEO S12 (GPT-SSBRK)

1 x Lifting Ring (VNT-XHBRK)

Or 1 x Truss hook (VNT-TCBRK)

IMPORTANT

Ensure that suspension point is strong enough to hold GEO S12 weight.

Procedure

Slide GPT-SSBRK side plates into GEO S12 connecting plate oblong holes;

Lock safety pins into GEO S12 connecting plate;

IMPORTANT

Ensure that safety pins are properly locked into GEO S12 connecting panels.

Position “U” bracket over these side plates; align center holes;

Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO
S12 from rotating around “U” bracket;

Cable suspension:

Connect lifting ring VNT-XHBRK to “U” bracket by inserting 8x45 quick release pin
dedicated holes;

Ensure lifting ring is properly locked to “U” bracket;

Connect assembly to suspension point with sling and shackle (not provided).

Truss suspension

Connect truss hook VNT-TCBRK to “U” bracket by inserting 8x45 quick release pin in
dedicated holes;

Ensure truss hook is properly locked to “U” bracket;

Lift and position assembly, lock hook on truss suspension point and secure with hook
cable.


Advertising
This manual is related to the following products: