Required items, Procedure – Nexo LS18 User Manual

Page 44

Advertising
background image

Page 44/103

GEO

S12

HARDWARE SETUP PROCEDURE

8.3.8 GEO S12 horizontal array cable mounted on a ceiling

Required items

2 x VNI-LBRK (allows cable suspension for horizontal arrays, holes for cable suspension
are 10mm diameter);

(N-1) x VNI-ANPL for a N x GEO S12 array (ANPL1 ranges from 0.2° to 3.15°, ANPL2
ranges from 5° to 10°, ANPL3 ranges from 16° to 30°);

N x VNI-CPLA for N x GEO S12 array;

4 slings and 4 shackles (not provided).

IMPORTANT

Ensure that the ceiling is strong enough to hold GEO S12 cluster weight and that the
cables suspension system required fixing the cluster under the ceiling is properly
dimensioned.

Procedure

Proceed as in above section, VNI-LBRK being positioned on the outer cabinets instead
of VNI-ABRK.

4 slings and 4 shackle (not provided) are required to secure the cluster under the ceiling;

Advertising
This manual is related to the following products: