Brocade Universal Four Post Rack Kit Installation Procedure (Supporting VDX 6740T) User Manual

Page 15

Advertising
background image

Universal Four-Post Rack Kit Installation Procedure

15 of 20

53-1002944-01 Rev.B

Attaching the extensions to the front of the switch

Complete the following steps to attach the extensions to the front of the switch.

1. Position the right extension along the side of the switch as shown in

Figure 9

.

2. Attach the bracket using four 8-32 x 5/16-in. flathead screws.

3. Repeat

step 1

and

step 2

to attach the left front extension to the left side of the switch.

4. Tighten all the 8-32 x 5/16-in. screws to a torque of 15 in-lbs (17 cm-kgs).

FIGURE 9

Attaching the bracket extensions to the switch

1

Bracket extensions

2

Screws, 8-32 x 5/16-in., flathead Phillips

Advertising