Attaching the front brackets – Brocade Universal Four Post Rack Kit Installation Procedure (Supporting VDX 6740T) User Manual

Page 7

Advertising
background image

Universal Four-Post Rack Kit Installation Procedure

7 of 20

53-1002944-01 Rev.B

Attaching the front brackets

Complete the following steps to attach the front brackets to the switch.

1. Position the right front bracket with the flat side against the right side of the switch at the front of the switch, as

shown in

Figure 2

.

2. Insert four 8-32 x 5/16-in. flathead screws through the vertically aligned holes in the bracket and then into the

holes on the side of the switch. Use the upper and lower screw holes, leaving the center holes empty.

3. Repeat

step 1

and

step 2

to attach the left front bracket to the left side of the switch.

4. Tighten all the 8-32 x 5/16-in. screws to a torque of 15 in-lbs (17 cm-kgs).

FIGURE 2

Attaching the front bracket

1

Switch

3

Screws, 8-32 x 5/16-in., flathead Phillips

2

Brackets, front

Advertising