Hardware installation, Power protection, Chapter 3 – Brocade Mobility RFS9510 Controller Installation Guide User Manual

Page 13

Advertising
background image

Brocade Mobility RFS9510 Controller Installation Guide

9

53-1002918-01

Chapter

3

Hardware Installation

Power protection

If possible, use a circuit dedicated to data processing equipment. Commercial electrical
contractors are familiar with wiring for data processing equipment and can help with the load
balancing of these circuits.

Install surge protection. Be sure to use a surge protection device between the electricity source
and the Mobility RFS9510 Controller.

Install an Uninterruptible Power Supply (UPS). A UPS provides continuous power during a
power outage. Some UPS devices have integral surge protection. UPS equipment requires
periodic maintenance to ensure reliability. A UPS of the proper capacity for the data processing
equipment must be purchased.

Hardware installation

The following sections describe the hardware installation for the Mobility RFS9510 Controller:

CAUTION

A Mobility RFS9510 Controller requires a two man lift. Use all appropriate cautions.