Site preparation, Getting started, Pre-installation checklist – Brocade Mobility RFS9510 Controller Installation Guide User Manual

Page 6: Location & equipment, Additional equipment recommended

Advertising
background image

2

Brocade Mobility RFS9510 Controller Installation Guide

53-1002918-01

Site preparation

1

Do not install this equipment or work with its power circuits during thunderstorms or other
weather conditions that could cause a power surge.

Verify there is adequate ventilation around the device, and ambient temperatures meet
equipment operation specifications.

Site preparation

Consult your site survey and network analysis reports to determine specific equipment
placement, power drops, and so on.

Assign installation responsibility to the appropriate personnel.

Identify and document where all installed components are located.

Provide a sufficient number of power drops for your equipment.

Ensure adequate, dust-free ventilation to all installed equipment.

Identify and prepare Ethernet and console port connections.

Verify cable lengths are within the maximum allowable distances for optimal signal
transmission.

Getting started

This guide provides a pre-installation checklist and instructions for installing the Mobility RFS9510
Controller, accessing the Graphical User Interface (GUI), and performing initial configuration.

Pre-installation checklist

Location & equipment

Mobility RFS9510 Controller shipping container contents:

Mobility RFS9510 Controller

Locking front bezel with keys

Mounting rail kit

Brocade Mobility RFS9510 Controller Installation Guide (this document)

NOTE

Keep the front bezel keys in a secure location which can only be accessed by authorized personnel.

Additional equipment recommended

Standard, grounded 100-240 VAC 50/60 Hz connection

UPS (uninterruptable power supply)

Standard 19-inch rack (2U height) with mounting rails.

Advertising