Rollup drive – single / double rack mount, Figure 8, Detail a detail b curtain bottom cabinet – Hired-Hand RollSeal Rollup Curtains: ROLLUP CURTAIN SYSTEM Rev 12-07 User Manual

Page 17

Advertising
background image

Part No. 4801-5169 Rev 12-07

Rollup Curtain System

Page 17

C- Channel

7. Rollup Drive – Single / Double Rack Mount

1. Center cabinet over framed opening directly against the C-channel. See Figure 8 Detail A.
2. Place the L-bracket on the C-channel and mount with Tek Screws.
3. Fasten the L-bracket to the cabinet with Tek screws. Place two L-brackets (typically) at the top and two at

the bottom of the cabinet.

4. Screw through the C-channel into the tubular members of the cabinet.
5. Verify that the Bottom of the curtain is two inches from the bottom of the cabinet. See Detail B.






































Figure 8

L Bracket

Lower Cabinet

Upper Cabinet

C- Channel

Self Drilling
TEk Screws

L Bracket

Self Drilling
TEk Screws

1 "

(approx.)

Detail A

Detail B

Curtain
Bottom

Cabinet

Advertising