End pocket installation, Insert vent bolt, Figure 11 – Hired-Hand RollSeal Rollup Curtains: ROLLUP CURTAIN SYSTEM Rev 12-07 User Manual

Page 20

Advertising
background image

Part No. 4801-5169 Rev 12-07

Rollup Curtain System

Page 20

10. End Pocket installation

The End Pockets are 12' in length and must be cut to the length of the total system.

1. Cut End Pockets to the desired length.

1. Fasten C-channel to brackets with sheet metal screws to form C-channel assembly. Repeat for top C-channel,

middle C-channel, and bottom C-channel assemblies. NOTE: Be sure to use End Pocket Spreader Bracket.


2. Attach the top and bottom Spreader Bars with sheet metal screws.

3. Attach End Pocket with sheet metal screws through the flange on the end of the End Pocket.

4. Attach the front of the Spreader bars with sheet metal screws.
























11. Insert Vent Bolt

Locate the Vent Bolt in the Vinyl seal under the motor
cover plate. See Figure 16. Remove the bolt in the top
of the gear box and insert the Vent Screw. See Figure
12.


Sheet Metal
Screws

End Pocket

Optional

C-Channel for

High Wind Use

Spreader bar
(Attach back with
sheet metal screws)

Spreader bar (Attach
back with sheet metal
screws)

Figure 11

Figure 12

– Insert Vent Bolt

Remove bolt for Vent

Bolt

Advertising