Erecting front wall supports, Erecting rear wall supports, Mount tie down ratchets to base plates – Rhino Shelter ROUND-30W X 40L X 15H User Manual

Page 8

Advertising
background image

Assembly Instructions

30x40x15 Round Style Portable Building With Single Door

8

Version 2.0

Please DO NOT return unit to store or dealer. For all questions or shortages please contact

Customer Service at: 800-447-7079 or 203-877-7070

Cross Rails inside Frame Overlapped on Same Bolt


Install Interior Arch #5 (next to Rear Arch), with the Wind
Brace Support Tabs on the Sidewall Tube (3D) facing
the Rear End Arch. Install Rear End Arch into Base
Flange Sockets. Install final Cross Rails (Purlin
Horizontal Tubes) and Wind Cross Brace Assemblies as
described above. Check end Arch for plumb before
securing the Wind Brace bolts tight.

Next check entire frame assembly for square and plumb.
Adjust Wind Braces and Cross Rails (Purlin Horizontal
Tubes) as necessary to being frame into plumb. Next
tighten frame bolts adequately. Do NOT over tighten
bolts so as to oval or compress frame components.

ERECTING FRONT WALL SUPPORTS


Step #5 –Assemble Front Wall Framing

Assemble Side Beam for Front Panel from Upper Door
Track (10) and Lower Door Track (11). Support Door
Track with Upper Beam of Front Panel (12) at junction
point. Lower Door Track goes into Base Flange (6) at
the base. Upper door track (10) secures to Curved Roof
Tube (2A) at top with 10 mm X 30 mm Bolts (25).
Repeat this assembly procedure for both left and right
side of Front Panel for Door. Do not fully tighten bolts
and nuts until all framing is in place and plumb.

Assemble Door Beam (39) across Upper Door Tracks
(10). Use M10x75 Bolts and Nuts. Next assemble
Lower Beam of Front Panel (12A) on right side of
assembly. This beam will support door roll up assembly.


Once all frame members are in place, use a level to
check for plumb and square. Adjust as needed. After all
is plumb, tighten nuts and bolts adequately. Do not over
tighten hardware to compress or oval frame members.

ERECTING REAR WALL SUPPORTS


Step #6 – Assemble Rear Wall Framing

Assemble Vertical Upper Standing Legs (9) to each side
of rear arch assembly. Legs go into Base Plate (6) at
base, and attach to Rear Arch Curve Tube (2B) at the
top. Side Beam (9) secures to Curved Roof Tube (2B)
at top with 10mm x 30mm Bolts. Position and secure
Back Panel Middle Beam (13A) horizontally between two
Upright Beams (9). Next assemble Horizontal Side
Beam for Back Panel (13) on each left and right side of
Rear Arch assembly. Secure Side Beams (13) for Back
Panel across rear arch with 10 mm x 30 mm Bolts and
nuts.


Once all frame members are in place, use a level to
check for plumb and square. Adjust as needed. After all
is plumb, tighten nuts and bolts adequately. Do not over
tighten hardware to compress or oval frame members.

MOUNT TIE DOWN RATCHETS TO
BASE PLATES


Step #7 – Bolt Ratchets to Base Flanges

Advertising