Maintenance, Maintenance schedule – Seed Hawk GRANULAR AND LIQUID TANKS 2008 User Manual

Page 49

Advertising
background image

MAINTENANCE


MAINTENANCE SCHEDULE

Procedure Frequency

check lube clean

change hours

Item

9

6

‘

S

5

Reference Notes

Wheel Hubs
main frame

6

100

100 hr or annually
re-pack bearings or 2 pumps grease

Metering System
sprockets and chains

6

25

25 hr or every 2 days
use dry graphite lubricant

Metering Components
Seed Hawk

“

‘

100

100 hr, or, before seeding, or,
between product changes

Fan System
intake

9

‘

10

10 hr or daily
remove accumulated debris

Fan System
fan blades

9

‘

10

10 hr or daily
must be intact and clean

Fill Auger System
10 in

‘

100

when changing between products,
or,
when stored for long periods of time

Fill Auger System
pillow block bearings

6

10/100

10 hr or daily, and,
100 hr or annually

Fill Auger System
universal joints

6

10/100

10 hr or daily, and,
100 hr or annually

Tank Return Line
open - drain in pail

9

100

at end of seeding season, or,
when stored for long periods of time

Tires
air pressure

9

10

10 hr or daily
inflate to proper pressure

NOTE:

The HEX BORE bearings on each Stainless Steel meter are sealed.
DO NOT GREASE THESE BEARINGS.

Advertising