American Dryer Corp. AD-310 Phase 7 Tilting User Manual

Page 38

Advertising
background image

34

Consistent gas pressure is essential at ALL gas connections. It is recommended that a 2-inch (5.08 cm)
pipe gas loop be installed in the supply line servicing a bank of dryers. An in-line pressure regulator must
be
installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches (29.9 mb) of
water column (W.C.) pressure.

IMPORTANT: A water column pressure of 3.5 inches (8.7 mb) for natural gas is required at the

gas valve pressure tap of each dryer for proper and safe operation.

A 1/8-inch N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas
supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural gas must be used.

IMPORTANT: Test ALL connections for leaks by brushing on a soapy solution (liquid

detergent works well).

WARNING: NEVER TEST FOR GAS LEAKS WITH A FLAME!!!

ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST
EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 or
LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and
must be done by a qualified professional. It is important that gas pressure regulators meet applicable
pressure requirements, and that gas meters be rated for the total amount of ALL the appliance BTUs being
supplied.

Advertising