Chapter 3: installation – Sterlco SGBD Series Batch Gravimetric Blenders User Manual

Page 30

Advertising
background image

Bulletin Number

Chapter 3: Installation

30 of 101

Chapter 3: Installation

3-1 Uncrating the Equipment

Slide Gate/Auger Blenders are shipped mounted on a skid, enclosed in a plastic wrapper, and
contained in a crate.

1. Remove crate from around blender.

2. Secure strap of proper lifting capacity to both lifting lugs (See Figure 20 below.).

Caution!

Use approved safety straps or chains to lift the blender at the marked lifting
points.

3. Lift blender until strap is taut.

4. Remove bolts attaching bottom of blender to shipping skid.

5. Lower blender slowly.

Figure 20: Blender Lifting Lugs (1 on each side)

3-2 Mechanical

Installation

It is the intent of this section to familiarize the reader with the proper site requirements and
installation procedures of the Slide Gate/Auger blending system. The information in this
section is NOT meant to replace or supersede an established local or company implemented
procedures. It is meant to enhance them.

The installation procedure should be used as a general guideline for the proper installation
steps required to install the Slide Gate/Auger blending system.

1. Lift blender and position over machine throat or floor stand.

2. Set in position and secure by tightening four bolts.

3. Remove lifting strap.

Advertising