background image

Bulletin Number

Chapter 3: Installation

31 of 101

4. If equipped; adjust the four leveling bolts on the floor stand blender support rails.

5. Mount the material conveying system receivers on the top of the blender supply

hoppers.

6. Align the weigh hopper on the load cell brackets. Carefully adjust the load cell

brackets to ensure that the weigh hopper is centered on the brackets without rocking.
If for some reason the locating tabs do not align with the weigh hopper, they can
easily be loosened and adjusted.

7. Check the slide gate metering assemblies to ensure they are not damaged, and will

slide back and forth freely. These are the most important items on the blender,
besides the load cell and weigh hopper assemblies.

Site Requirements

This section describes site requirements in detail. These requirements are broken down into
mechanical mounting, electrical connections and pneumatic connections. Since the Slide Gate
Blender is available in several different mounting arrangements, it is necessary for the reader
to become familiar with the different arrangements.

Mounting Configurations

The Slide Gate System is available in (3) three basic mounting arrangements. They are:

• Machine Mount
• Mezzanine Mount
• Floor Mount

Machine Mount

In a machine mounting application of the Slide Gate unit, there are a few items to review
before placement and mounting of the blending system begins.

First, verify the machine flange dimensions match the Slide Gate blender flange (if the
optional pre-drilled holes were ordered). The Slide Gate blender can also be equipped with an
optional cast throat section with a drain port. This will bolt under the bottom plate of the
blender.

Verify that the machine throat is physically capable of supporting the Slide Gate blending
system with a full load of material and vacuum loading equipment installed.

Verify all clearances on the top and beside the processing machine. This is to insure that all
motors, hoppers, control panels, etc. have adequate room for proper operation and servicing.

Refer to the assembly drawing with the unit for actual height and width dimensions.

Note: Use extreme care when tightening bolts on top of the load cells so you do

not spring the load cells. The load cells are extremely delicate and should
be treated with care!

Note: While in operation, the Slide Gate blender applies horizontal and

vertical pressures to the mounting flange. If there is a question as to the
mechanical stability of a mounting flange, contact the manufacturer’s
engineering department.

Note: Allow at least 36” clearance around blender to provide adequate room

for cleaning, servicing, etc.