Chapter 5: maintenance, 1 preventative maintenance schedule – Sterlco BP800 Series Granulators User Manual

Page 23

Advertising
background image

800 Series beside-the-press

Chapter 5: Maintenance

23 of 43

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

Before carrying out any work on the granulator, carefully read the instructions
provided in this manual.

Only specialists and competent personnel should carry out these operations.


All maintenance work must be carried out with the granulator switched OFF and with
the power supply disconnected and locked out.

Conduct that is not in accordance with safety instructions outlined in this manual may
pose a threat to both personnel and equipment.

Once the maintenance work is completed and before re-starting the granulator, make
sure to check the following:

ü

Any parts that may have been replaced and/or tools that have been used are

removed from the granulator.

ü

All safety equipment is in proper working condition.

Periodic Maintenance Schedule

Mechanical Check

Frequency

Knife clearance and wear

Weekly

Rotor knife retaining screws for tightness

Weekly

Downstroke bed knife and shield retaining screws for

tightness

Weekly

Upstroke bed knife retaining screws for tightness

Weekly

Screen cradle arm screws for tightness

Weekly

In-feed chute and cutting chamber screws for tightness

Monthly

After the granulator has been used for the first day, adjust the drive belt
tension. Correct tension for use should be the minimum at which the belt does
not slip. Make sure the pulleys are correctly aligned.

Advertising