11 tensioning and guying – Anchor Industries NAV50-1204 User Manual

Page 12

Advertising
background image

11

TENSIONING AND GUYING

1. USE WEB/RATCHETS TO SECURE CATENARY ARCHES TO

UPRIGHTS, STAKE BASEPLATES BEFORE TENSIONING WEBS.

2. ATTACH GUY WEBS TO EAVE WELDMENTS AND STAKE OUT AT

A 45 DEGREE ANGLE (DISTANCE OUT = HEIGHT OF UPRIGHT,

USUALLY 8 FT. USE 42” STAKES PROVIDED.

3. AT DOUBLE-GUYED CORNERS, GUYS FORM A 90 DEGREE ANGLE.

DOTTED LINE REPRESENTS THE
RAFTER THAT IS IN LINE WITH THE
PEAK/RIDGE WELDMENT.

STAKING DISCLAIMER: DUE TO VARYING SOIL CONDITIONS AT
EACH INSTALLATION SITE, THE STAKES PROVIDED MAY NOT
MEET THE LOADING REQUIREMENT SHOWN ON THE BLUEPRINT
AND ENGINEERING ANALYSIS. IT IS THE INSTALLERS RESPON-
SIBILITY TO VERIFY THE SOIL CONDITIONS AND PROPER
ANCHORING DEVICES REQUIRED AT EACH SITE TO ENSURE A
SAFE INSTALLATION.

TOP

CATENARY

TAILS

TENSIONING
WEB (RIGHT)
W/ RING

TENSIONING
WEB (LEFT)
W/ RING

TENSIONING RINGS

OVERLAPPED

WEB/RATCHET

UPRIGHT

TENSIONING METHOD:

1. PASS RING OF LEFT TENSIONING WEB THROUGH OPPOSITE

CATENARY RING.

2. PASS RING OF RIGHT TENSIONING WEB THROUGH ITS OWN

CATENARY RING (PASSING OVER THE LEFT WEB).

3. CONTINUE RING OF RIGHT TENSIONING WEB THROUGH

OPPOSITE CATENARY RING.

4. OVERLAP BOTH TENSION RINGS. ATTACH WEB/RATCHET

AND TENSION DOWNWARD AGAINST TENSION HOLE IN

UPRIGHT. (CATENARY RINGS SHOULD MOVE CLOSER

TOGETHER AS RATCHET IS TIGHTENED.)

TOP

TOP

CATENARY

TAILS

CATENARY

TAILS

TRIANGLE

RING

TENSION RINGS

(OVERLAPPED)

WEB/RATCHET

UPRIGHT

TENSIONING METHOD:

1. PASS BOTH TENSION RINGS

THROUGH THE TRIANGLE RING.

2. OVERLAP THEM AND ATTACH

WEB/RATCHET TO TENSION
DOWNWARD.

TENSIONING METHOD-
ATTACH WEB/RATCHET
TO TRIANGLE RING AND
TENSION DOWNWARD.

11-T

FABRIC STRAPS ON UNDERSIDE OF
BOTH HIP END PANELS MUST BE
SECURED AROUND RAFTERS AND HIP
BARS, AS PROVIDED. TO

Advertising