Ab c d – Anchor Industries NAV50-1204 User Manual

Page 3

Advertising
background image

DIRECTIONS FOR SQUARING THE TENT

1. USE A TAPE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (A TO B ABOVE)

EQUAL TO THE EXACT WIDTH OF THE UNIT.

2. HOLD THE “0” END OF ONE TAPE AT POINT “A” AND THE “0” END OF ANOTHER TAPE

AT POINT “B”.

3. EXTEND THE FIRST TAPE ALONG ONE SIDE OF THE UNIT TO A MEASUREMENT

EQUAL TO THE EXACT LENGTH OF THE TENT.

4. CONSULT THE CHART BELOW TO FIND THE DIAGONAL FOR THE TENT YOU ARE

BUILDING.

5. EXTEND THE SECOND TAPE TO A MEASUREMENT EXACTLY EQUAL TO THIS DIAGONAL.

6. BRING THE TWO TAPES TOGETHER SO THAT THE LENGTH MEASUREMENT OF ONE LIES

DIRECTLY ON THE DIAGONAL MEASUREMENT OF THE OTHER. PULL THE TAPES TIGHT

AND MARK THEIR INTERSECTION. THIS WILL LOCATE A FAR CORNER (POINT “D” ABOVE).

7. SWITCH TAPES SO THAT TAPE 1 (ABOVE) MEASURES THE DIAGONAL AND TAPE 2 (ABOVE)

MEASURES THE LENGTH. THIS WILL LOCATE POINT “C” ABOVE.

8. WITH THE FOUR PRIMARY CORNERS LOCATED, LAY OUT BASEPLATES AND UPRIGHTS

ACCORDING TO THE DIAGRAM TO THE RIGHT AND BEGIN ASSEMBLY, DOUBLE-CHECKING

FROM TIME TO TIME TO MAKE SURE THE SQUARE FOOTPRINT IS BEING MAINTAINED.

LENGTH OF TENT

DIAGONALS FOR SQUARING FOOTPRINT

DIAGONAL SHOWN IN FEET-INCHES (TO NEAREST INCH)

WIDTH OF TENT

2

WIDTH OF TENT

LENGTH OF TENT

SQUARING THE TENT FOOTPRINT LAYOUT

LOCATING
THE FOUR
PRIMARY
CORNERS

DIAGONAL

A

B

C

D

BASEPLATE

SIDE

INTERMEDIATE

UPRIGHT

END

INTERMEDIATE

UPRIGHT

OUTER DIMENSIONS ARE
OUTSIDE-TO-OUTSIDE

INTERMEDIATE DIMENSIONS
ARE CENTER-TO-CENTER

C/L

C/L

Advertising