What to do if the self test fails, What to do if the self test fails 2-16, Table 2-3: outdoor unit leds -16 – Alvarion BREEZENET RB-DS.11 User Manual

Page 32

Advertising
background image

BreezeNET DS.11 Series User Manual

2-16

Name Description

Functionality

ETH

Ethernet activity/
connectivity indication

OFF –Ethernet connectivity is OK.
No traffic activity detected on the port.

Blinking Green –Ethernet connectivity is OK, with traffic on
the port.

Red – No Ethernet connectivity. When this state occurs, check
the Ethernet cable and indoor-to-outdoor cable connections.

RSSI/Load
BAR

RB-DS.11: Received Signal Strength Indication

BU-DS.11: Number of associated RB-DS.11 units

Table

2-3: Outdoor Unit LEDs

What to do if the Self Test Fails

Upon failure of the self-test, the WLAN, DC Power and ETH LEDs, as well as the
leftmost 2 LEDs of the RSSI bar are blinking synchronously. The statuses of the
other 8 LEDs of the bar indicate the specific problem type.

If the Self-Test fails, try the following:
♦ Reset unit (Disconnect/reconnect the power).
♦ Check the indoor-to-outdoor cable.
♦ Reset to factory defaults (see page 3-31).

If all fails, contact technical support and provide details regarding the status of the
RSSI LEDs.

Advertising