Installation

20

F232058

Mechanical Installation

(Continued)

Figure 8

After the anchor bolts are installed and the
concrete has cured, proceed as follows:

1. Place the washer-extractor adjacent to the

foundation. Do not attempt to move it by
pushing on the sides. Always insert a pry
bar or other device under the bottom of the
frame of the washer-extractor to move it.

2. Remove the wood skid by unscrewing the

carriage bolts holding it to the bottom
frame of the washer-extractor.

3. Place the washer-extractor carefully over

the anchor bolts. Never attempt to lift the
machine by the door handle or by pushing
on the cover panels.

4. Raise and level the washer-extractor 1/2

inch off the floor on three points, using
spacers such as nut fasteners.

5. Fill the spaces between the washer-

extractor base and floor with a good
quality non-shrinking machinery grout to
ensure a stable installation. See Figure 9
for grouting the 35-pound capacity model.
See Figure 10 for grouting the 50-pound
capacity model. See Figure 11 for grouting
the 85-pound capacity model.

Figure 9

Figure 10

2"

(51 mm)

6"

(152 mm)

MIN

Locknut

Base Frame

Grout

Anchor

Bolt

3 1/2 x 2 Inch

Dia. Bolt

U095IEP

U096I