Installation, Figure 24, Uf85 models – Alliance Laundry Systems BF50PV User Manual

Page 40: Phase connections, Control connections

Advertising
background image

Installation

38

F232058

Figure 24

T1

T2

T3

12

L1

L2

L3

11

A2

A1

NX101

OFF

ON

NX101

~

~

4-conductor cable from pump
motor connects here.

3-Phase Connections

CIRCUIT BREAKER

Splice cap

Cable #223 factory installed
in AC Drive Box

RED

RED

BLACK

BLACK

GREEN-YELLO

W

Watertight PG 21
strain relief

2-conductor cable from pump
motor (thermal overload)

4-conductor cable from pump
motor (3-phase power)

AC Drive Box

Cut, strip, and crimp blue spade terminal
(sized for screw) to green-yellow wire.
Use #10 screw and nut provided to
attach wire to panel.

Control Connections

PUMP CONTACTOR

From mains contactor
L1, L2, and L3 terminals

R023I

UF85 Models

Advertising
This manual is related to the following products: