Rotating the logo badge, Attaching the ups front bezel, Attaching the tower conversion stands – HP Tower Uninterruptible Power System User Manual

Page 27

Advertising
background image

Installation 27

Rotating the logo badge

Gently pull out the logo badge, rotate it 90 degrees, and then replace it in the bezel.

Attaching the UPS front bezel

Attaching the tower conversion stands

WARNING:

To reduce the risk of personal injury or damage to the equipment, the tower

conversion stands must be properly attached when the unit is installed as a tower.

Advertising