Testing the new battery module, Replacing the ups – HP Tower Uninterruptible Power System User Manual

Page 47

Advertising
background image

Maintenance 47

To replace the components, reverse the removal procedure.

IMPORTANT:

Charge the batteries for at least 24 hours before supplying backup power to

devices. The batteries charge to:

80 percent of their capacity within 3 hours

100 percent of their capacity within 48 hours

Testing the new battery module

After installing the new battery module, press the Test/Alarm Reset button to initiate a self-test ("

Initiating a

self-test

" on page

41

).

IMPORTANT:

The UPS does not execute a self-test until the batteries are 90 percent charged.

IMPORTANT:

Charge the batteries for at least 24 hours before supplying backup power to

devices. The batteries charge to:

80 percent of their capacity within 3 hours

100 percent of their capacity within 48 hours

If the installation has been successful, the Battery Fault LED is not illuminated. If the installation has not
been successful, the Battery Fault LED illuminates. If this occurs, repeat the UPS battery replacement
procedure (on page

46

), and check the battery terminal connections. If the Battery Fault LED is still

illuminated, see "LED and audible alarm troubleshooting ("

LED troubleshooting

" on page

52

)."

For the location of buttons, see "UPS front panel controls (on page

8

)."

For the location of LEDs, see "UPS front panel LED indicators (on page

8

)."

Replacing the UPS

To remove the UPS:

1.

Power down all attached load devices.

Advertising