HP 3PAR Operating System Software User Manual

Page 153

Advertising
background image

failover started with tasks: 6740

root@xnodeeca5:~/bin# waittask -v 6740

Id Type Name Status Phase Step -------StartTime------- -FinishTime-

6740 remote_copy_failover multi.1.r96 active 1/3 0/1 2009-06-29 14:43:44 PDT -

Detailed status:

2009-06-29 14:43:44 PDT Created task.

2009-06-29 14:43:44 PDT Begin Failover operation on group multi.1.r96 started.

2009-06-29 14:43:47 PDT Pushing Pushing newer data from target SystemB to group multi.1.r96.

2009-06-29 14:43:47 PDT Waiting Waiting for synchronization of group multi.1.r96 to target

SystemB to complete.

2009-06-29 14:44:04 PDT Pushed Completed push of newer data from target SystemB to group

multi.1.r96.

2009-06-29 14:44:05 PDT Switched Group multi.1.r96 was switched from secondary to primary.

2009-06-29 14:44:05 PDT Starting Starting group multi.1.r96 to target SystemB.

2009-06-29 14:44:09 PDT Started Remote copy was started for group multi.1.r96 and target

SystemB.

2009-06-29 14:44:09 PDT Completed Group multi.1.r96 failover completed.

Failing Over to the Asynchronous Periodic Backup System (with Data Transfer)

153

Advertising
This manual is related to the following products: