Contents of the rack server shipping carton, Installing hardware options, Setting up a tower server – HP ProLiant ML350 G5 Server User Manual

Page 25

Advertising
background image

Setup 25

UPS

Contents of the rack server shipping carton

Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the

rack or the server.
The contents of the server shipping carton include:

Server

Power cord

Hardware documentation, Documentation CD, and software products

Rack-mounting hardware

In addition to the supplied items, you may need:

T-15 Torx screwdriver

Hardware options

Operating system or application software

PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the

option documentation. For server-specific information, refer to "Hardware options installation (on page

29

)."

Setting up a tower server

Follow the steps in this section to set up a tower model server. If you are going to install the server into a

rack, refer to the rack installation ("

Installing the server into the rack

" on page

26

) section.

Advertising