Installing the server into the rack, Tion, Section – HP ProLiant ML350 G5 Server User Manual

Page 26

Advertising
background image

Setup 26

1.

Install the feet.

2.

Return the server to an upright position.

3.

Connect peripheral devices to the server ("

Rear panel components

" on page

9

).

WARNING:

To reduce the risk of electric shock, fire, or damage to the equipment, do not plug

telephone or telecommunications connectors into RJ-45 connectors.

4.

Connect the power cord to the rear of the server.

5.

Connect the power cord to the AC power source.

WARNING:

To reduce the risk of electric shock or damage to the equipment:

Do not disable the power cord grounding plug. The grounding plug is an important safety

feature.

Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.

Unplug the power cord from the power supply to disconnect power to the equipment.

Do not route the power cord where it can be walked on or pinched by items placed against
it. Pay particular attention to the plug, electrical outlet, and the point where the cord

extends from the server.

Installing the server into the rack

Advertising