HP ProLiant DL385 G2 Server User Manual

Page 53

Advertising
background image

Hardware options installation 53

1.

Remove the power supply blank.

WARNING:

To reduce the risk of electric shock or damage to the equipment, do not connect

the power cord to the power supply until the power supply is installed.

2.

Slide the power supply into the power supply bay until the release/lock lever clicks, securing the
power supply.

3.

Connect the power cord to the power supply.

4.

Tighten the two retaining screws on either side of the power cord connector.

5.

Route the power cord:

o

If the cable management arm has a left-hand swing, route the power cord through the cable
management arm.

o

If the cable management arm has a right-hand swing, remove the cable management arm or
convert it for left-hand swing. For removal instructions, see "Cable management arm with right-

hand swing (on page

29

)." For conversion instructions, see the instructions that ship with the 2U

Quick Deploy Rail System.

Advertising