HP ProLiant ML350e Gen8 Server User Manual

Page 83

Advertising
background image

Hardware options installation 83

7.

Install the LFF hot-plug drive cage.

8.

Using the T-15 screws, secure the drive cage to the server.

9.

If installed, remove the PCI air baffle (on page

28

).

10.

Remove any installed full-length PCI cards.

11.

Remove the system air baffle (on page

30

).

12.

Remove the fan cage (on page

31

).

Advertising