Sub frame hardware kit checklist – Speedtech Nova Subframe User Manual

Page 2

Advertising
background image

2 |

P a g e



Sub Frame Hardware Kit Checklist

Sub Frame Instructions -1

Bolts

Upper shock mount (2)

½ x 1 ¾ Shoulder bolt

Motor mount frame pad (6)

7/16 x 3/4 NF

Transmission X member (4)

7/16 x 1 1/4 NF

Upper control arm mount (4)

7/16 x 2 1/4 NF

Sway bar mounting (4)

3/8 x 1 NF

Nylock Nuts

7/16 (8)

3/8 Large Flange (2)

Washers

7/16 (22)

3/8 (6)




Sway bar mounting hardware is included with the sway bar and the sway
bar end links are included with the High Clearance lower control arms.

Advertising
This manual is related to the following products: