Operation – Hot Max Torches WP201 User Manual

Page 9

Advertising
background image

KDAR Company

8

Operation

Suction Hose Installation

Note: Use commercially available suction hose
that is reinforced with non-collapsible wall or
braided wire construction.

1. Slide a hose coupler into the hose clamp ring.
2. Insert sealing washer into the hose clamp ring.
3. Securely thread the hose clamp ring onto in-

take port. (see diagram below)

4. Slide hose clamp over the hose.
5. Slide hose over the hose coupler.
6. Move hose clamp up over the hose coupler

and tighten securely.

7. Slide a hose clamp over the other end of the

suction hose.

8. Slide suction hose over the strainer.
9. Move hose clamp up over the strainer con-

nector and tighten the hose clamp.

Discharge Hose Installation

Note: Use commercially available discharge
hose.


1. Slide a hose coupler into the hose clamp ring.
2. Insert sealing washer into the hose clamp ring.
3. Securely thread the hose clamp ring onto dis-

charge port. (see diagram below)

4. Slide a hose clamp over the hose.
5. Slide hose over the hose coupler.
6. Slide hose clamp over the hose coupler and

tighten securely.

Priming the Pump

Note: Operating the pump dry will destroy the
pump seal. If the pump has been run dry, stop
the engine immediately, allow to cool and prime
the pump.

1. Remove the filler cap.
2. Completely fill the pump chamber with water.
3. Reinstall the filler cap and tighten securely.

Advertising
This manual is related to the following products: