Alto-Shaam AR-6G User Manual

Page 8

Advertising
background image

AR-6G Rotisserie Operation & Care Manual • 6

I n s t a l l a t I o n

ANSI/NSF4

AR-6G Rotisserie Operation & Care Manual • 6

s I t e I n s t a l l a t I o n

VentIlatIon reQUIrements

A ventilation hood is mandatory for the operation

of the appliance. The ventilation hood must be installed

in accordance with local building codes for the steam

exhaust and must protrude 12" to 20" (300 to 500mm) over

the front side of the appliance. A grease filter must be

located in the protruding area of the hood. Grease filters

should be thoroughly cleaned on a regular basis following

manufacturer's instruction. Ventilation hoods must ensure

an adequate amount of incoming air during operation and
must be operated whenever the appliance is used.

posItIonInG on sIte

Lift the appliance from the pallet with a fork lift or

pallet lift truck positioned at the front of the appliance. For

damage protection, the use of two wooden boards, placed

between the bottom of the appliance and the lifting forks, is

strongly recommended.

Stand the appliance in a level position. Use the

adjustable casters to overcome an uneven floor and ensure

that the unit is level.

To insure proper operation, the installation of this

appliance must be completed by qualified technicians in

accordance with the instructions provided in this manual.

Failure to follow the instructions provided may result in

damage to the appliance, building, or cause personal injury

to personnel.

InstallatIon coDes & stanDarDs

The following codes and standards are required for installation of this appliance: AIR SUPPLY,

ELECTRICAL CONNECTIONS, WATER CONNECTIONS, GAS CONNECTIONS, GAS EXHAUST, AND

WASTE WATER DISCHARGE.
Installation must comply with local codes required for gas appliances. In the absence of local codes, installation must

comply with the National Fuel Gas Code, ANSI Z223.1 (latest edition). In Canada, the appropriate code is the Natural

Gas Installation Code, CAN/CGA-B149.1 or the Propane Installation Code, CAN/CGA-B. Adherence to code by

a qualified installer is essential for the following: Gas Plumbing, Gas Appliance Installation, Commercial Cooking

Ventilation, Water and Plumbing, and OSHA Regulations.

stanDarD for Gas fooD serVIce eQUIpment

ANSi Z83, 11-2006/CSA 1.8 - 2006

The information contained in this manual is important for the proper installation,

use and maintenance of this appliance. Please read carefully and retain for future

reference. Improper connection of this appliance will nullify all warranties.

c a U t I o n

TO PREVENT PERSONAL INJURY,

USE CAUTION WHEN MOVING OR

LEVELING THIS APPLIANCE.

mInImUm clearance reQUIrements

BOTh SIDES

18" (457mm)

BACk

4" (102mm)

TOp

20" (508mm)

FOR AIR MOvEMENT

Advertising