Installation, Oven assembly – Blodgett DFG-50 User Manual
Page 9
Advertising
7
Installation
Oven Assembly
4” (10CM) LEG ATTAChMENT
1. Lay the oven on its side.
2. Screw one leg into each of the corner nuts.
Figure 5
CASTER INSTALLATION
NOTE: Casters are not supplied for the 4” (10cm) legs,
5-3/4” (15cm) or 7” (18cm) stands.
NOTE: Install the locking casters on the front of the oven.
Install the non-locking casters on the back of the
oven.
1. Insert the caster into the leg. Secure the caster to the
leg by tightening the locknut.
Figure 6
OVEN LEVELING
After assembly, the oven should be leveled and moved
to the operating location.
1. The oven can be leveled by adjusting the feet or cast-
ers located on the bottom of each leg.
Advertising