Operation screen – American Power Conversion Bypass Static User Manual

Page 16

Advertising
background image

10

Symmetra® MW with Internal Bypass Static Switch - User Guide - 990-1756A-001

Operation Screen

The Operation screen permits system operation and monitoring, and provides the ability to change
display settings (as illustrated in the following menus).

Push the Operation/Configuration button to open the Operation screen.

The Operation screen leads to the following screens:

– UPS Start-Up screen

– UPS Shutdown screen

– Online to Static Bypass screen

– Static Bypass to Online screen

– Network Configuration screens

– User Configuration screens

– View Event Log screen

– Predictive Maintenance screens

Normal

~

~

Q7

Q8

Normal

0:00 AM

Q2

UPS Summary

Normal

5.40 PM

Startup

Shutdown

Network Configuration

User Configuration

View Event Log

Predictive Maintenance

Static Bypass Online

Online Static Bypass

Transfer from manual bypass to online

Transfer from online to manual bypass

Transfer from online to static bypass

Transfer from static bypass to online

Operation

Normal

Advertising