Pre-installation – Armstrong World Industries EHU-703 User Manual

Page 4

Advertising
background image

PRE-INSTALLATION

1) CHECK SHIPMENT

A claim should be filed with the transportation company (and reported to Armstrong) if any items

are missing or damaged. Your shipment will arrive in two or three cartons.

One carton holds the humidifier with the steam generator installed, the control humidistat and
sensing element, two short steam hoses, hose clamps, mounting plate and lag screws, and a
clear drain hose. If you have ordered a duct pressure switch or a high limit stat, these too will
be in the humidifier carton.

The steam dispersion tube(s) and fittings are contained in another carton ( two for the EHU 704).

Two complete sets of
installation instructions have
been shipped with your unit.
One is for the installer's use.
The second is for the owner's
files.

2) CHECK LOCAL CODES

Series EHU-700 humidifiers
should be installed in
accordance with ALL
applicable building, plumbing,
and electrical codes.

3) SITE SELECTION

Electronic steam humidifiers
must be installed in locations
that allow routine inspection
and accessibility for maintenance
operations. See Figures 4-1 & 4-2
for access space.

Do not place electronic steam humidifers
in locations where unusual instances of
malfunction of the humidifier or the
system might cause damage to
non-repairable or un-replaceable,
or priceless property.

4

4" Side
Clearance
Both Sides

5" Min. Drain
Connection Access

24" Min. Steam
Generator
Tank Removal

4" Side
Clearance

24" Front
Clearance

5" Min. Drain
Connection Access

24" Side
Clearance

Figure 4-2. EHU-703/704

Figure 4-1. EHU-701

Advertising
This manual is related to the following products: