Boiler location, Installation in a kitchen cupboard, Installation in an airing cupboard – Atmos Energy INTERCOMBI HE32 User Manual

Page 16: Remove front panel

Advertising
background image


16

4.4

Boiler location




















Clearances
Above casing

200mm min

Below casing

230mm min

RH

30mm

min

LH

30mm min (in operation)

LH 140mm

min

(servicing)

Front

30mm min (in operation)

Front 450mm

min

(servicing)

Keep 50 mm free space above the front panel in order to be able to
remove the front panel from the casing. Allow 140 mm on the left side for
swinging out the expansion vessel during commissioning/service.
The appliance can be fitted to a mounting frame. The assembly or just
the appliance should be mounted to a wall with sufficient bearing
strength. In case of light wall constructions, resonance sounds may
occur.
The appliance is suitable for mounting on a combustible wall (eg stud

wall).
There must be an earthed electrical supply within a distance of 1 m from
the appliance.
In order to avoid freezing of the condensate discharge, the appliance
should be installed in a frost-free room.

4.4.1 Installation in a kitchen cupboard

Make sure there is sufficient ventilation above and below the appliance.
When the appliance is placed in a small cupboard, ventilation openings

of at least 50 cm

2

must be made.

4.4.2 Installation in an airing cupboard

Compartment ventilation is not required for a standard airing cupboard

(eg 0.6 x 0.6 x 2.3m high).

4.4.3 Remove front panel

Remove the optional pipework cover and the front panel for carrying out
work on the appliance as follows:-
1. Remove the pipework cover (A), if used, forwards.
2. Unscrew both recessed crosshead screws (B) at the bottom of the

appliance.

3. Lift the front panel (C) vertically upwards and remove it forwards.