Installation Instructions - Flat Roof

• Roll out Sheet Drain with the length of the roll going with the slope of

the roof (ensure it is flat and does not curl).

• Rows of the Sheet Drain will abut one another.

• Offset seams of the grids and seams of the drainage mat for best results.

• Cut out the Sheet Drain around roof drains to allow water to escape.

• DO NOT adhere the Sheet Drain to the waterproofing membrane.

INSTALL SHEET DRAIN

IMPORTANT:
Follow
drainage mat
manufacturers’
installation
recommendation

In certain cases, pavers must be adhered
to the grid for security (e.g. cut pavers,
wind uplift conditions, around drains
or where potential standing water
could exist, stairs). Consult your AZEK
Paver representative in all applications
where wind uplift is a concern for
recommendations.
• Using a recommended adhesive (see

page 2) place a 1/4" bead across the
top ribs of the grid.

• Place the paver in the grid and press

down firmly.

• Let pavers sit undisturbed for duration

of adhesive cure time.

• A 28 oz. tube of adhesive will cover

approximately 25 square feet.

ADHERING PAVERS TO GRID

Each application is different, and the
perimeter must be secured accordingly.
AZEK Pavers recommends adhering a
minimum of 16" around the perimeter.
For applications that do not end at
a wall or parapet, AZEK Resurfacing
Bullnose Pavers or AZEK Resurfacing
Transition Pavers can be used to finish
off the open perimeter. See pages 21 or
22 for installation details.

SECURING PERIMETER PAVERS

AZEK Pavers should NOT be filled with joint sand when installed on a flat
roof. For specific application questions please call (877) ASK-AZEK.

Finishing The Project

Do not sweep
sand in paver
joints on flat
roofs.