3 installation, 1 space requirements, 2 installation process – Beijer Electronics iX Panel T60 EN User Manual

Page 10: 3installation

Advertising
background image

Installation

3

Installation

3.1 Space Requirements

Installation plate thickness: 1.5 - 7.5 mm (0.06 - 0.3 inch)

Space requirements when installing the operator panel:

50 mm

152 mm

202 mm

(2.0 inch)

50 mm

(2.0 inch)

100 mm

(4.0 inch)

100 mm

(4.0 inch)

100 mm

(4.0 inch)

57 mm

(2.24 inch)

(7.95 inch)

(5.98 inch)

Caution:
The openings on the enclosure are for air convection. Do not cover these openings.

3.2 Installation Process

1. Unpack and check the delivery. If damage is found, notify the supplier.

x 4

Panel cut out 180 x 130 mm

(7.09 x 5.12 inch)

Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.

Beijer Electronics, MAEN005

10

Advertising