Boiler jacket assembly – Amtrol OWB Series User Manual

Page 34

Advertising
background image

Boiler Jacket Assembly


48

26A

25

26

Sight
Class

Assy

33

60

86

38

94

36

43

18

93

41

18

40


Figure 31. OWB-35 and OWB-50 Assembly Detail


OWB-35 and OWB-50 Jacket Installation Instructions

1. Screw the four extension setscrews (43) into the four outer holes in the corners of

the rear sections. Securely tighten the setscrews and other fastening bolts of the
flue outlet cover (22)

2. Place the large wraparound insulation mat (40) over boiler block (aluminum foil

side facing out).

3. Place smaller piece of insulation on top of wraparound insulation. This will

provide double thick insulation on top of the boiler block.

4. Remove flue collector clean-out covers (62)
5. Push the two smaller pieces of insulation (60) onto the flue collector (22) so that

the four extension setscrews (43) protrude through the insulation.

6. Attach rear jacket panels (36) and (38) to the two extension screws(43) using the

M6x10 pan head screws. Screw the rear panels together in the center using sheet
metal screws provided. Reattach the clean-out covers.

7. Place right and left side panels (93) (94) into the factory mounted hinge bracket

(18) and hook into the rear panels (36) (38).

34

Installation, Operation, And Service Instructions

Advertising