Medium Power Substation Transformers

location and Mounting

The transformer should be mounted on a level concrete

foundation of sufficient strength to support the weight

of the completely assembled transformer. If the

transformer is not level, insulating fluid may not circulate

properly through the cooling assembly, possibly causing

overheating and reduced transformer life. The mounting

location should provide for adequate ventilation and

easy access for inspection. The transformer should be

located at least 24 inches from any obstruction. When

installing transformers designed for indoor operation,

adequate air inlets and outlets must be provided for

proper cooling. Avoid locating transformers in corrosive

areas.

Opening Transformer Tank

Transformers are usually shipped sealed and should not

be opened unless necessary. Opening the transformer

will be necessary when transformers are shipped without

bushings, when internal field connections are required,

or when core ground tests are required.

DANgER

: SlOWlY RElEASE INTERNAl

PRESSURE PRIOR TO REMOvING TANK

ACCESSORIES. FAIlURE TO DO SO COUlD RESUlT

IN SEvERE PERSONAl INJURY, DEATH, OR PROPERTY

DAMAGE.

DANgER

: TO AvOID DEATH FROM

SUFFOCATION NEvER AllOW ANYONE TO

ENTER THE TRANSFORMER TANK UNlESS AN

ANAlYSIS OF THE AIR IN THE TANK SHOWS AT lEAST

19.5% OXYGEN. THE GAS SPACE IN AN OPERATING

TRANSFORMER USUAllY CONSISTS OF NITROGEN

GAS. WHENEvER ANYONE IS IN THE TANK, A

PERSON SHOUlD BE STATIONED AT THE MANHOlE

OUTSIDE THE TANK TO ENSURE SAFETY OF THE

PERSON INSIDE.

Transformer should not remain open for more than

24 hours at a time. If work is interrupted, the tank

should be resealed, evacuated, and filled with dry air or

nitrogen.

To prevent contamination of the transformer tank, do

not open the transformer in an unprotected area during

inclement weather or where the air may contain dirt

or other particles. Either of the above could cause

a transformer failure. The tank opening should be

protected against entry of foreign matter.

If it is necessary to remove some fluid from the tank to

allow for inspection or other work, the transformer must

be refilled with fluid after work is completed.

Personnel should not be permitted on top or inside the

transformer while it is open unless they have emptied

all pockets and checked for loose objects that might fall

into the tank. All tools should be accounted for after

work is completed. It is recommended that any tools

used on top of the transformer or inside the tank be

attached with safety cords to prevent them from being

lost inside the transformer.

Personnel must not stand directly on any electrical

insulation. Clean drop cloths should be used under

working areas in the transformer to prevent objects from

dropping into the core/coil assembly.

The following procedure should be used to remove the

manhole cover.

1. Thoroughly clean the manhole cover.

Remove all moisture, dirt, and grease to

avoid contaminating the transformer’s fluid

compartment.

2. Relieve internal tank pressure by manually

operating the pressure relief valve.

3. Remove cover fasteners.
4. Gently pry the cover upward, making sure that

the cover gasket does not fall into the tank. lift

the cover vertically to prevent damage to cover,

bolts, and gasket.

5. Remove the gasket sections from the manhole

flange. Record the location and orientation of

each gasket piece, so they can be reinstalled

correctly.

The following procedure should be used to reinstall the

manhole cover.

1. Place gasket sections in their original positions

and orientations.

2. Reinstall manhole cover. Reinstall fasteners

and torque to 25 ft-lbs. After tightening all

fasteners, re-torque each one to ensure proper

torque.

3. Remove the pressure relief valve and pressurize

the headspace and check for fluid leaks. Do not

exceed 7 PSIG during this test. This pressure

should be maintained for at least four hours.