2 before starting installation, 1 general installation recommendations, Before starting installation – ADC PowerWorx Power Distribution Products User Manual

Page 16: General installation recommendations, Figure 3, 2before starting installation

Advertising
background image

ADCP-80-545 • Issue 3 • March 2006

Page 10
© 2006, ADC Telecommunications, Inc.

Figure 3. Dimensions of Select Series Circuit Breaker Panel

2

BEFORE STARTING INSTALLATION

This section provides general installation recommendations, unpacking and inspection
procedures, and lists the tools and material required for panel installation.

2.1

General Installation Recommendations

The Select Series circuit breaker panel must be installed in a central office, equipment room,
CEV or other restricted access location. Mount the panel in the uppermost area of the rack to
reduce the exposure of the power wiring.

Route ground, power, and alarm cables to the panel according to local practice and procedures.
After routing the cables, secure them to the equipment rack or to any cable management devices
that are in use. Follow the instructions provided in this manual when connecting the cables to
the panel. Install the protective covers on the rear side of the panel after all the wiring

17.13 INCHES

(435 MM)

23.00 INCHES

(584.2 MM)

22.3 INCHES

(567.7 MM)

11.11 INCHES

(282 MM)

10.01 INCHES

(254 MM)

1.73 INCHES

(43.9 MM)

1.125 INCHES

(28.6 MM)

17938-A