Single-phase (1ø) electrical connection leads – American Dryer Corp. AD-27 User Manual

Page 23

Advertising
background image

19

Actual electrical wire connections are made to the L1 and L2 terminals of the motor contactor located
in the rear service box mentioned on the previous page (page 18). The ground connection is also made
to the copper lug also provided in this box.

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/
pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service
breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

NOTE: A separate circuit servicing each dryer must be provided.

Single-Phase (1Ø) Electrical Connection Leads

Black

+

Positive

White

-

Neutral

Green

Ground

or

L2

Advertising