Frame installation – Alamo JD-5225 User Manual

Page 36

Advertising
background image

© 2005 Alamo Group Inc.

Section 4 - 4

Switch Blade (JD-5105-5205-5225-5325-5425-5525, Asy. Man) 05/05

7.

Cutter Head Assembly. The Cutter head

Assembly is shipped completely assembled with
the Skid Shoe, Actuator Pre-Assembly, Carriage
Arm, Hydraulic Cylinders, Hydraulic Motor, Drive
Assembly, Motor Cover and Cutter Bar Assem-
bly attached (See Figure 4). To mount this the
carriage Arm (See Figure 5) which has the Car-
riage Arm Mounting pin installed in it when shipped
will have to have the pin removed (See Figure 4
pin is removed).

8.

Install Cutter Bar Head Assembly Using

an over head hoist lift and slide the cutter bar
assembly into place until the carriage arm is in
alignment with the sub-frame (See Figure 1 )
mounting holes. Insert the carriage arm mount-
ing pin (See Figure 5, 6 & 7) and the two retain-
ing bolts and nuts that were in the retaining pin
when it was removed from the carriage arm.

9.

Install The Hydraulic Tank Assembly. The

hydraulic tank is shipped as an assembly with
the filter and directional solenoid valve attached
to it. The Hydraulic tank will bolt to the frame (See
Item 4 Figure 1) with 4 bolts, lockwashers and
Nuts (See Figure 1 & 7)

10.

Make Certain Bolts are Tightened. Make

certain that the mounting bolts so far are tight.

Figure 4

Carriage Arm Asy

Carriage Arm Pin

Figure 5

Figure 6

Figure 7

Tank
Mounting
Bolts

Carriage
Arm Pivot
Pin

Frame Installation

Advertising
This manual is related to the following products: